The C1-400 project involved extending the Red Luas line by 1.5km from Busaras / Connolly Station through docklands to the Point Village development.
To minimise disruption, and maximise traffic flows on Amiens Street, our works allowed the main contractor to operate within a series of complex traffic management switches, which at one stage involved realigning the main road some 15m east of its original position.
Key features of CHM’s service
- Detailed programming and phasing meetings with the main contractor.
- CHM’s technical expertise and input to devise temporary road layouts for challenging work locations.
- CHM’s ability to supply and install kilometres of temporary vehicle restraint barrier (Massguard)
- CHM’s capacity to provide 24 hour daily maintenance to the ensure the integrity of the temporary traffic measures.